Highview Condominium II
Board of Directors - Meeting Minutes
January 26, 2010, 7:30 p.m.

The third meeting of the 2009-2010 Highview Condominium II, Inc. Board of Directors was called to order at approximately 7:40 p.m. by Stacey Cohen, President.  

Board members in attendance:  Robert Boynton, Joseph Cann, Marjorie Cannon, Stacey Cohen, Nora Colford, and Natalie Hendrix.  Board members Michael D’Angelo, Angelo Morelli, and Joseph Skonieczny were absent.  Linda Romolo attended from Wentworth Property Management.  

1)   Minutes:  Minutes of the November 16, 2009 and December 9, 2009 meetings were approved.  

2)   Maintenance update from super:  Chris Brighina joined the meeting to report on building maintenance items and concerns.  

3)   Financial Report:  

      a)   Unit Owner Arrears.  Status of legal actions were discussed.  

      b)   Operating and Capital Reserve Account balances were discussed.  

      c)   Audit for FY2008:  The final version of the FY2008 audit has been completed and mailed to unit owners.  

      d)   Audit for FY2009:  The FY2009 audit will begin shortly once Wentworth completes the December 2009 financials.  

      e)   Capital Reserve assessment:  The FY2010 Special Assessment to increase Capital Reserve will begin as scheduled on March 1, 2010.  

4)   Legal Report:  

      a)   Rules & Regulations:  The Board approved an increase in the fine for the noise violation rule.  Effective January 1, 2010, a second or additional noise offense within a six month period will increase from 100 to $250.  A first offense will remain $100.  This change was made in response to a chronic situation, police being summoned to the building on at least one recent occasion, and complaints filed with management by seven unit owners.  Depending on the type of violation, unit owners are typically warned prior to a first fine.  

            The Board approved a fine increase to $100 effective January 1, 2010 for “noxious or offensive activity”.  A second offense within six months will be $250.  This action was taken in response to a recent late night incident on the first floor.  It was indicated that this was not the first such instance.  The super was asked to inspect the door of a unit for damage, consider replacement of the common property if indicated, and bill cost of replacement to the offender.  

            A fine was issued to a unit owner for smoking in the first floor common area hallway.  Multiple complaints had previously been received about anonymous cigarette butts found on the first floor hallway and in one previous incident the resident was observed on camera and by a fellow resident flicking a live butt from the elevator onto the first floor hallway.  

      b)   Repair of damage common property:  The board asked Romolo why a damaged unit entrance door (common property) had not been replaced promptly following their November 16th request.  Romolo indicated that the unit owner had said that they had already ordered a replacement.  It was noted that as of this evening’s meeting the door has not been replaced.  Romolo will first request proof from unit owner that door is on order.  Romolo was once again asked to complete the replacement without further delay and bill the owner.  Romolo will first request proof from the unit owner that the door is on order.  

      c)   Local Law 11 façade inspection (cycle 6):  Romolo still in process of re-submitting the Cycle-6 engineering report for Local Law 11.  

      d)   Unit Leases:  Romolo indicated that all unit owners are currently in compliance with Highview’s lease approval and renewal requirements.  

      e)   Underground fuel oil tank.:  Operating license from NYC has been renewed.  

      f)    Management contract renewal:  Contract for Wentworth Property Management being reviewed.  Will require board approval prior to signing by President.  

      g)   Laundry room contract renewal:  Contract for CoinMach being reviewed by management.  There was no further discussion.  Will require board approval prior to signing by President.  

      h)   Building staff:  Super’s evaluation completed. Copy need to be forwarded to board secretary.  

6)   Building Repair & Maintenance Report:  

      a)   Exhaust fan system:  Ventilation contractor will be inspecting the non-functioning line by camera and making repairs once blockage is located.  

      b)   Wall shift/crack::  Romolo will get contractor estimate.  

      c)   Semi-annual smoke detector replacements and unit inspections:  Chris Brighina reported that the fall 2009 unit inspections were completed in late November except for three units.  Brighina will update at next meeting.  

      d)   Replacement/upgrade of exterior and lobby lighting timers:  The two bids were not for identical work.  Joe Cann continuing to review bids with Chris and authorize most appropriate work without further board input.  

      e)   Parking lot: repairs:  Chris Brighina reported that the cracks in the parking lot have been repaired and the wall lines re-painted.  From the September board meeting, Linda Romolo was to get bids for parking lot sealing and resurfacing for the board’s information and future consideration.  Romolo had no bids at this meeting.  

      f)    Plumbing break in drain pipe:  Although sprinkler system has been drained for the winter, leakage into parking garage continues.  Plumber will be called in to camera the line.  Break had been previously identified in the drainage line and a temporary patch was installed.  

      g)   Garage door operation:  Overhead door does not stop and reverse when it is closing and encounters an object in its path.  Discussed since September without resolution.  

      h)   Entrance area tile cracks:  There was discussion of cracks in exterior entrance area tile and loose grout at the September meeting and management was to investigate and provide repairs bids so that repairs can be completed before winter/freezing.  There was no update at this meeting, but Romolo will get estimates  

      i)    Lobby ceiling:  The building super will be replacing several ceiling access panels and touching-up the ceiling later this week.  

      j)    Plumbing repair:  The sprinkler head in the laundry room is still dripping.  There was discussion extending to related repairs needed.  

      k)   Flower bulb planting:  Was completed at end of 2009.  

      l)    Damaged compactor chute door on third floor:  Romolo reported that the 3rd floor compactor chute door was replaced by NuWay.  

      m)  Telephone pole damage:  Romolo was asked to follow-up with the City concerning the damaged telephone pole as a risk to building property and residents.  Verizon and ConEd both indicate it is the other’s problem to remedy.  It was noted that both Verizon and ConEd have transferred their equipment to the new pole and that the only equipment still attached to the pole seems to be the street light.  Board suggested Romolo call 3-1-1.  

      n)   Carpeting replacement:  Romolo and Cohen investigating replacement of damaged carpeting.  

      o)   Fire Escape repairs:  Romolo has contractor making repairs.  

      p)   Elevator repairs:  Inspection by VSA has resulted in a list of repairs.  

The meeting adjourned at approximately 9:15 p.m.  

Minutes submitted by Robert Boynton, Secretary.