Highview Condominium II The sixteenth meeting of the 2006-2007 Highview II Board of Directors was
called to order at approximately 7:30 p.m. by Richard Re, President. Board members in attendance: Victor Bellini, Miriam Biren, Robert Boynton,
Joseph Cann, Marjorie Cannon, Stacey Cohen, Nora Colford, and Richard Re. Al
Lamoglia was absent. Debbie Shapass attended from Wentworth Property Management. 1) Minutes: Minutes of the January 15, 2008 meeting were approved. 2) Management transition: Although TKR Property Services contract
ended on 12/31/07, the transition from TKR to Wentworth Management remains
incomplete. 3) Financial Report: a) Monthly financial report: December fiscal reports have not been
provided by TKR Property Services. b) Monthly arrears report: Debbie Shapass reported that as of this
meeting she still does not have accurate information from TKR. It appears that
TKR may still be continuing to accept monthly common charges from Highview
residents while not transferring the funds to new management. Debbie confirmed
that the situation discussed at the last meeting with an owner who had been
charged by TKR several times over for the same legal bill has been cleared up. c) FY2006 audit: Victor Bellini reported that the FY2006 audit being
conducted by Wilken & Guttenplan is still not complete. The auditors are
still waiting for information from TKR Property Services. d) FY2007 audit: Although a FY2007 audit should be started, Bellini
reported that Wilken & Guttenplan will not offer a proposal for the FY2007
audit until the FY2006 audit is completed. The cost of the audit is now
currently over $12,000. Negotion of the bill will be handled by Debbie Shapass. e) FY2008 budget: Debbie Shapass and Treasurer Victor Bellini will
propose FY2008 budget as soon as FY2007 financial records from TKR are sorted
out. f) Reserve accounts: Victor Bellini reported that the mailing
address on the Chase accounts need to be changed to Wentworth’s address in
order for these funds to be incorporated in monthly management reports.
Boynton and Bellini will arrange to have the signature cards updated (requires
signature of two officers for funds transfer). g) Super’s health insurance: Debbie Shapass reported that health
insurance has been obtained for the super and will be taking effect March 1,
2008 4) Legal Report: a) Rental/Leases – records update: Debbie Shapass reported that
she has asked the owners of rental units for copies of their current leases.
Noting that she has not received copies from several owners it was noted that
they are subject to $500/month fines for non-compliance. Debbie will begin
fines as needed for non-compliance. b) Emergency contact forms: Debbie Shapass reported that many
residents have not returned the completed forms. She will provide an
additional reminder and be going door-to-door with the super to get them
completed in the next few weeks as needed. Board members volunteered to assist
with their neighbors. c) Local Law 11 inspection progress: Debbie Shapass reported that
she has contacted Becht Engineering and they reported that their work is
completed. She is waiting for a copy of their report. d) The discussion from the last meeting concerning whether unit owners
should be required to carry liability insurance for damage to other units was
briefly discussed. The board will continue discussion of topic at next
meeting. 5) Building Repair & Maintenance Report: a) Litter container: Debbie Shapass is in the process of ordering
larger litter/cigarette container for exterior entrance area. It was
reaffirmed that unit owner who destroyed the old unit has only been charged
for original sized container unit. b) Fire Plan, Smoke Detectors, Window Guard Notice: Debbie indicated
that the annual Fire Plan distribution and Window Guard notice will be
combined with super’s smoke detector battery replacement and unit water leak
inspections in the next few weeks. c) Plumbing estimates: Sewer line inspection by Altomonte Plumbing:
Altomonte will discuss their findings and recommendations at the board’s
March meeting. Debbie Shapass reported that she will be getting estimates from
other plumbing contractors for the same work proposed by Altomonte for sewer
and drain line repairs and maintenance, water infiltration, and addition of a
domestic water filtering system. It was noted that water service lines in unit
L-H remain partially blocked. d) Elevator repairs & maintenance: Debbie Shapass is getting
estimates from several vendors for the critical repairs outlined in the VSA
report. There was discussion of McGlynn Hays maintenance contract and their
failure to and offer the board recommendation. e) Building ventilation exhaust fans: Debbie Shapass indicated that
a contractor will be investigating the problems previously discussed (three
fan units determined by Becht Engineering to not match the specifications that
were supposed to be ordered by JAL Management, confirming that individual
apartment units have not added fans that interfere with building exhaust
operation, and possible blockages in the ducts). f) Carpet estimates: No update. g) Boiler: Debbie Shapass reported that she has met with Star Boiler
and is getting estimates for repairs. Several inspection certificates had
expired without TKR taking appropriate action over the past year. She is
scheduling the inspections. The board approved basic repair estimate. h) Garage maintenance: There was discussion of the garage wall
painting project that was scheduled to begin once the parking lot walls were
completed. The meeting adjourned at approximately 9:30 p.m. Minutes submitted by Robert Boynton, Secretary
Board of Directors - Meeting Minutes
February 19, 2008, 7:30 p.m.