Highview Condominium II
Board of Directors - Meeting Minutes
February 23, 2016 7:30 p.m.
The seventh regular meeting of the
2015-2016 Highview Condominium II Board of Directors was called to order at
approximately 7:30 p.m. by Sindhu Mathew, President.
Board members in attendance: Joseph Cann, Marjorie Cannon, Joan Desantis,
Rosanna Fernandez, and Sindhu Mathew.
Robert Boynton was unable to attend in person, but participated by
conference call. Board members
absent: Michael D'Angelo, Bernard Davis,
and Madalina Rauscher. Siobhan
Hickey and Marissa Zinnanti attended from Carriage House Property Management.
1) Building Repair &
Maintenance:
a)
Board approved Milano bid for restoration of second floor, north-end,
hallway exhaust vent.
b) Residents colliding
at lobby-level fire door. Incident
discussed and discussing option with vendors for either larger window in door,
cautionary signage, and/or a way of limiting how quickly door opens.
Noted that a resident waiting for the elevator was hit and knocked to the
floor by the door being opened.
c) Parking lot
resurfacing: No update.
d) Front entrance
refinish of doors/windows bids:
Board requested discussion with contractor concerning explanation of process.
Getting additional bid from South Shore Glass.
e) Garage floor:
Awaiting sealant bids for spring/summer work..
f) Wallpaper
and carpet replacement: Contract
signed. On hold pending building
loan.
g)
Compactor room - toilet installation:
Awaiting completion of design work by Salamon Engineering.
h) Electrical back-up
- generator system: Awaiting
completion of design work by Salamon Engineering.
i) North-end
sidewalk & stairwell repairs:
Management continues to receive contractor bids for stairwell north sidewalk,
sidewalk from north-east corner to entrance area, and various cracked flags and
curbs.
j)
Water infiltration reports:
Fall 2015 unit inspections completed with the exception of three vacant
and two occupied units. Once
complete, exterior masonry repairs can be bid.
k) Security
upgrades/repairs: Remainder of
repairs holding pending building loan.
l) Spring unit
inspections: Super to begin
Spring 2016 unit inspections and smoke detector battery replacements.
m) Heating complaint:
Management investigating a heating complaint from unit 4-C.
2) Financial Report:
a) Account balances:
Reviewed.
b) Unit
arrears: Board reviewed unit
arrears with managing agent.
c) Building Loan:
At the General Membership meeting of 01/28/16,
a vote was
taken according to the Bylaws authorizing the Board of Managers to take out a
5-year $400,000 loan for Capital repairs and renovations.
Sixty-six percent of the building's unit owners according to unit points
were represented at the meeting and the authorization was approved with no
dissenting votes. The Board has
subsequently applied to Empire State Bank for the loan and the bank has advised
the Board that we should anticipate a reply to the application in 4-8 weeks.
If Empire State Bank approves the loan, unit owners will then have 30
days to decide whether to pre-pay their individual share of the $400,000 or be
locked into participation in the loan.
If the Board receives a positive reply from the bank, unit owners
will then receive an update and the forms to complete in 30 days with their loan
participation decision.
d) Audit for FY2015:
Work on the FY2015 audit by Louis Picaro of Sciarrino Kindya & Co. and
Financial Solutions Group continues.
e)
Monthly financial reporting:
Board has requested monthly financial report to reflect budgeted versus
actual by cost center as well as YTD figures.
Should indicate budget remaining in various cost centers.
No update.
3) Legal Report:
a) Building insurance:
Current insurance company has indicated that they will not be renewing
building's liability policy. Current
policy expires 03/20/16. Management
seeking bids. Bids discussed.
b)
Unit liens: Discussed.
c) NYC code violations:
One DOB building violation indicated by City on their website as
remaining open/active. Management
indicates violation is from 2012 and will require an engineering report.
At 09/2015 meeting, Board approved Salamon Engineering to conduct the
2012 report required by NYC. No
update.
d) Lease
compliance: Reviewed.
e)
Insurance compliance (owner coverage):
Reviewed.
f)
Insurance compliance (leased units/tenant coverage):
Reviewed.
g)
Insurance claim: Possible claim
against the building discussed. Not
certain whether claim is against 830 Howard Ave. or 850 Howard Ave.
No update.
h)
Contact information for unit 3-D and 4-G:
Discussed status of unit and legal contact information.
No progress.
4) Summary review of
meeting's action items: Not
reviewed.
The meeting was adjourned at
approximately 9:30 p.m Minutes
submitted by Robert Boynton, Secretary.