Highview Condominium II
Board of Directors - Meeting Minutes
February 28, 2012 7:30 p.m.
The second meeting of the
2011-2012 Highview Condominium II, Inc. Board of Directors was called to order
at approximately 7:30 p.m. by Stacey Cohen, President.
Board members in attendance: Robert
Boynton, Joseph Cann, Marjorie Cannon, Stacey Cohen,
Nora Colford, David Cutler, Natalie Hendrix, and Joseph Skonieczny.
Michael D’Angelo participated by telephone.
Linda Romolo attended from Wentworth Property Management.
1)
Minutes: Minutes of
the November 22, 2012 meeting were approved.
2)
Water infiltration: Board
reviewed bids for masonry investigation per Becht Engineering proposal.
Skonieczny
will discuss with Becht and recommend contractor for board approval by e-vote.
Vote to begin by Friday.
Maintenance
update from super: Chris
Brighina joined the meeting to report on building maintenance and concerns.
3)
Building Repair & Maintenance Report:
a) Garage Stairwell
Door: Replacement completed by
Minkel.
b) Stairwell painting:
Completed by super.
c) Entrance area tile
crack and grout repairs: Management
was to locate tile. No attempt made
to do so. Romolo now requested to
seek bids for comprehensive repair as Brighina reported that the loose and
cracked tiles are now also under the entrance threshold plate.
d) Water supply
filtering for unit L-H: Skonieczny
was to meet with plumbers and propose filtering remedy for unit L-H at next
Board meeting. No update.
e) Garage ceiling:
Building has been fined by the Fire Department on account of several
large holes surrounding plumbing in the garage ceiling.
The ceiling is a reinforced concrete fire-barrier that protects the
residential portion of the building from any possible automobile fire. Board
requested that Romolo get three repair estimates for email vote/approval.
Costs may be passed along to unit owners as the damage has been caused by
unit renovations.
f) Management’s
forms for written approval of unit renovations, etc.:
Romolo was asked to pass along forms to Boynton for addition to website.
g) Unit inspections
and smoke/CO2 detector battery replacements:
Spring inspections expected to be completed in April.
4)
Financial Report:
a) FY2012 budget:
FY2012 budget was approved.
b) FY2011 Annual
Meeting: Tentative date – May
or June, pending completion of audit.
c) Total current balance of accounts: approximately $307,000.
5)
Legal Report:
a)
Local Law 11 façade inspection (cycle 6) and Local Law 11 façade
inspection (cycle 7): City
now requesting copy of Cycle-5 report. Romolo
indicated she was unable to locate the Cycle-5 in Highview’s files and felt
that it was Becht’s job to locate the Cycle-5.
Rather than refer this back to Becht Engineering who had nothing to do
with the Cycle-5 inspection and was not contracted to locate or research
Highview’s files in performing the Local Law 11 pre-inspection, Romolo was
asked get a copy of the Cycle 5 report from appropriate City office, get
the Cycle-7 report from Becht Engineering and
directly oversee the complete submission of the Cycle 7 report with whatever
supporting documentation the City requests.
b)
Rules Violations:
Per November Board meeting, the Rules & Regulations and Schedule of
Fines were reviewed and final changes approved by the full board in January
2012.
The meeting was adjourned at
approximately 9:30 p.m.
Minutes
submitted by Robert Boynton, Secretary.