Highview Condominium II
Board of Directors - Meeting Minutes
April 3, 2013 7:30 p.m.
The second regular meeting of the
2012-2013 Highview Condominium II, Inc. Board of Directors was called to order
at approximately 7:30 p.m. by Marjorie Cannon, Vice President.
Board members in attendance: Robert
Boynton, Marjorie Cannon, Joseph Cann, Nora Colford, and Joseph Skonieczny.
Board members absent: Stacey Cohen, David Cutler, Michael D’Angelo, and
Natalie Hendrix. Idalia Gallopp
attended from Wentworth Property Management.
1)
Minutes: Minutes of
the February 26, 2013 meeting deferred to distribution and approval by email.
Maintenance update from super:
Chris Brighina joined the meeting to report on building maintenance and
concerns.
2)
Building Repair & Maintenance Report:
a) Water
infiltration: Although the exterior work contracted with K.E.S. Construction
resolved most leaks (replacing caulking around all of the building’s windows,
while also inspecting lintels and sills and making repairs as needed according
to bid price) several leaks still remain. As
super completes repairs from old water damage, he has been monitoring.
Super will now inventory leaks with spring inspections.
Time-line discussed and anticipate June estimates for exterior repairs.
b) Masonry repairs:
K.E.S. Construction completed assorted masonry repairs in late March
including addition of a sidewalk flag near garbage cage, rebuild of overhead
garage door’s drain grating, and replacement of floor drain near parking space
#15. The anticipated replacement of
collapsing floor drain covers near both the side door and overhead door were not
included. Building super said that
he will be able to replace the covers and on account of liability concerns do so
immediately.
c) Entrance
area repairs: K.E.S.
Construction recommended full replacement of entrance area at cost of around
$30,000 to address cracks in brick pillars, three stress cracks in floor tile
areas which have been unsuccessfully repaired several times, doorway threshold
instability, and loose wall cladding that has been allowing pest infestations.
Management will seek additional bids.
No update at this meeting.
d) Repairs to
super’s apartment: Floor
repairs and addition of wall opening header remain on hold pending termite
investigation and resolution of exterior entrance area water infiltration, floor
tile and metal cladding problems.
e) Spring 2013
unit inspections: Super has
begun spring unit inspections and battery replacements.
f) Installation
of backflow restrictor and water filtering:
Engineering design work has been approved by the City and bids from
plumbers now being gathered by management for Board approval.
Cann and Skonieczny will review plumbing bids and make recommendation by
email for Board approval to expedite completion to avoid City fine.
g) Security camera
replacement/upgrade: No update
from Boynton.
h) Snow Blower:
Old snow blower sold.
i) Laundry room
contract: The two-year
laundry room contract extension has expired and CoinMach has submitted proposal
for new 8-year agreement. There was
discussion of the proposed 8-year term, new washers and dryers, and the monthly
rent paid to building. Building
currently pays all utility bills for the laundry room (water, gas, and electric)
and these costs to building were questioned.
Management will investigate costs of developing separate utility metering
of laundry room and provide copy to Board members of last full-term contract and
the 2-year extension. Board
requested additional vendor bids. Board
requested copies of original CoinMach contract and the 2-year extension.
3)
Financial Report:
a) FY2012 Audit
and annual meeting: Draft of
FY2012 audit has not been received by Board for approval.
Management asked to explain delays. Idalia
Gallopp will seek to distribute draft for approval so Board can set date for
Annual Meeting. Noted May would be
possible if approval could be quickly completed by email.
Noted that Bylaws require an early spring annual meeting unless Board
declares delay with cause.
b) Unit arrears:
Board reviewed unit arrears with managing agent, noting that legal process with
attorney begins after 60 days. Attorney
fees are added to account balance and move to court for lien on unit.
4)
Legal Report:
a) Local Law 11 façade inspection (cycle 6) and
Local Law 11 façade inspection (cycle 7): No
update.
b) Parking garage:
Management going to court in May with
c) Lease
compliance: Boynton continuing
to work with Maureen Gentile at Wentworth to verify compliance.
d) Insurance
compliance: No update at this
meeting.
e) Lease fees:
In response to management’s
question as to whether lease renewal fees could be billed for all units in
rental on January 1st, the Board confirmed that lease renewal fees
are only due for a particular unit at the time a lease renewal is provided.
Renewal fees are only charged for a new or renewal lease, not on an
annual basis; so a three-year lease only charged once for the 3-year term of the
lease. Whenever a unit’s lease has
expired, no new lease has been provided and the unit continues to be occupied by
tenants, a building violation exists subject to $500 fine.