April 22,  2014  7:30 p.m.

 

The ninth regular meeting of the 2013-2014 Highview Condominium II, Inc. Board of Directors was called to order at approximately 7:30 p.m.  

Board members in attendance: Robert Boynton, Joseph Cann, Marjorie Cannon, Stacey Cohen, David Cutler, and Natalie Hendrix.  Michael D'Angelo called in.  Board members absent: Nora Colford and Joseph Skonieczny.  Maria Arzano attended from Wentworth Property Management.  

1)   Minutes:  Minutes of the March 25, 2014 meeting were approved.  

Maintenance update from super:  Chris Brighina reported on building maintenance.  

2)   Building Repair & Maintenance Report:  

a)    Garage masonry repairs: Masonry repairs by KES to two garage access plates completed.  Replacement of one plate remains.  

b)   Installation of backflow restrictor and water filtering:  Final payment will continue to be withheld until NYC certification received.  Certification remains to be completed.  Residents noted low water pressure over the weekend which was corrected by filter change.  First change after five weeks.  Super monitoring water pressure to help determine frequency of future changes.  

c)    Laundry room:  Uncertain whether vendor has added the remote monitoring from smartphones.  A credit of $5 is still to be issued for each unit owner as condition of the renewal contract.  No update from March meeting.  

d)   Hallways, Lobby, Elevator, and Entrance Area Renovation:  Management continues seeking designer recommendations.  Continued discussion.  Designers will be scheduled to attend May meeting.  

e)    Entrance area repairs:  Clarification since last meeting that interior designer will not be involved with exterior design work.  No other update since 11/27/12.  

f)    Garage wall crack repairs:  Leaks last repaired in July 2002 by epoxy injection.  Abbasi believed to have been the contractor and there was a lifetime warrantee on repairs.  In last 1-2 years have started leaking again.  Super will get estimates.  Management will check records for Abbasi Construction in Brooklyn and conditions of “lifetime warranty”.  No update since March meeting.  

g)   Television Service repair:  Television antenna completed.  

h)   Spring unit inspections:  Super working on spring inspections.  Inspections include plumbing leaks, exterior water infiltration, and battery replacements.  Indicated at this meeting that they will be completed by May meeting.  

i)    Compactor room clean-up:  The compactor room has been cleaned up and floor painted.  Arzano toured with Board after meeting and noted meter room violations on account of storage and debris.  Will inspect after this April meeting for same.  

j)    Maintenance log books:  Discussion of maintenance logs (boiler maintenance/service log, boiler water testing service log, and general maintenance log).  Noted that management is responsible for assuring a daily maintenance log.  Highview’s performance guidelines document indicates the written log is to include: “all repairs performed, projects undertaken and/or completed, building problems identified, resident requests, and rules violations.  When projects are completed, completion date should be noted in the log.  When projects involving residents are completed, residents should sign to agree that work has been completed to their satisfaction.”  Per March meeting, management was to share 2013 and 2014 logs at April Board meeting.  No reviewed at April meeting.  

k)   Stairwell door knobs/closures:  Per previous meeting, door knobs scheduled to be replaced by super this spring.  Not closing properly.  Super will complete in coming week.  

l)    Stairwell door hinge:  Hinge on new lobby-level door is broken.  Super will discuss with vendor and have repairs completed.  

k)   Garbage chute:  Garbage chute on third floor is broken.  Was replaced only a couple years ago.  Replacement approved.  

3)   Financial Report  

a)    Unit arrears:  Board reviewed unit arrears with managing agent.  

b)   FY2014 budget:  Budget remains unapproved.  Treasurer Michael D’Angelo indicated he hadn’t seen draft since December.  Per last meeting’s budget discussion, Laura Mezzio was contacting Wilken & Guttenplan in response to Board’s request for addition of a budgeted $36,500 Capital Savings required by previous vote.  

c)    Status of FY2013 Audit:  In progress.  As requirement of the audit, all previous Board minutes approved and submitted to auditor.  Questionnaire auditor requires management to complete, also submitted.  Boynton will contact auditor to determine completion date.  If complete, board will schedule meeting with auditor and then schedule date for FY2013 General Membership meeting.  

d)   Special Assessment and/or Building Loan:  Comprehensive listing of repair and replacement estimates continue to be gathered.  

e)    Operating and Reserve account balances:  Not reviewed.  

f)    Condominium Tax Abatement:  On account of changes in the law concerning annual NYC Cooperative and Condominium Tax Abatement, individual unit owners will need to apply to declare units as their primary residence.  Those individual Highview owners who completed the NYC forms have received their abatements, but for a number of unit owners in the building, units are not their primary residence and do not qualify for the abatement.  Accordingly, management cannot apply on behalf of the entire building as was done in the past.  

4)   Legal Report:  

a)    Local Law 11 facade inspection (cycle 6) and Local Law 11 facade inspection (cycle 7):  Certification has yet to be completed.  No update in over one year -- 06/26/12.  Discussed in detail at this meeting.  Wentworth’s Site Compliance officer now investigating.  

b)   NYC code violations:  Continuing discussion of five DOB and five ECB building violations indicated by City as remaining open.  Oldest open violation is dated 11/11/08 and most recent dated 01/15/14.  Management believes that all violations were resolved and building is in full compliance with City codes, however each past violation requires filing with NYC of a Certificate of Correction.  Management recommended that Highview engage a consultant to resolve with City.  Highview has requested that management pay the cost of consultant for resolving the open violations as all of the violations indicated as open are dates attributed to their management term (01/01/08 to present).  As of this Board meeting, consultant has not been engaged.  Noted that this issue was first brought to management’s attention six months ago at the 09/24/13 board meeting.  Wentworth’s Site Compliance officer now investigating.  

c)    Lease compliance:  Arzano will compare records with Boynton later this week.  

d)   Insurance compliance:  All units believed to be in compliance and Arzano reviewing.  Arzano will provide Board Secretary with completed Excel file of current expiration dates for all units later this week.  

e)    Building damage from traffic accident:  Insurance claim in process.  Estimate for repairs received; including masonry work to corner of building, lawn sprinkler system repairs, lawn repairs, electrical repairs, and replacement of bollard lighting.  Update at this meeting that the insurance of Access-A-Ride’s bus had expired.  Access-A-Ride wishes to negotiate directly with Highview II management.  Agreed that Access-A-Ride should discuss with building’s attorney.  Building’s damage, repair estimates, and police report all document the situation.  

The meeting was adjourned at approximately 9:00 p.m  

-          Minutes submitted by Robert Boynton, Secretary.