1)
Minutes: Minutes of
the February 26, 2013 and April 3, 2013 meetings deferred to distribution and
approval by email.
Maintenance update from super:
Chris Brighina joined the meeting to report on building maintenance and
concerns.
2)
Building Repair & Maintenance Report:
a) Water
infiltration: Interior repairs from prior water damage still in progress by
Chris Brighina. Still on schedule
for June bids for any remaining exterior repairs.
b) Masonry repairs:
At last meeting, building super indicated that he will be able to replace
the collapsing floor drain covers near both the side door and overhead door
immediately. No update at this
meeting. Liability concerns remain.
c) Entrance
area repairs: K.E.S.
Construction recommended full replacement of entrance area at cost of around
$30,000 to address cracks in brick pillars, three stress cracks in floor tile
areas which have been unsuccessfully repaired several times, doorway threshold
instability, and loose wall cladding that has been allowing pest infestations.
Management will seek additional bids.
No update since 04/03/13 meeting.
d) Repairs to
super’s apartment: Floor
repairs in progress. Wall opening
header to follow.
e) Spring 2013
unit inspections: Super has
begun spring unit inspections and battery replacements.
f) Installation
of backflow restrictor and water filtering:
Board approved plumbing contract.
g) Security camera
replacement/upgrade: No update
from Boynton.
h) Laundry room
contract: No update.
i) Electrical
back-up systems: No update at
this meeting.
j) Wallpaper
and carpeting replacement: No
update at this meeting.
3)
Financial Report:
a) FY2012 Audit
and annual meeting: Board
approved June 5, 2013 for FY 2012 annual meeting.
FY2012 audit has been distributed, but Board still needs to complete
approval of audit and will do so by email.
b) Unit arrears:
Board reviewed unit arrears with managing agent.
4)
Legal Report:
a) Local Law 11 façade inspection (cycle 6) and
Local Law 11 façade inspection (cycle 7): No
update.
b) Parking garage:
Court date postponed until June. Discussion
of easement enforcement and building’s liabilities for maintaining clear
common areas. Discussion of 04/08/13
final warning letters and subsequent fines.
c) Lease
compliance: No update at this
meeting.
d) Insurance
compliance: No update at this
meeting.
The
meeting was adjourned at approximately 9:30 p.m.
Minutes
submitted by Robert Boynton, Secretary.