Highview Condominium II
Board of Directors - Meeting Minutes
April 27, 2010, 7:30 p.m.
The fifth meeting of the 2009-2010
Highview Condominium II, Inc. Board of Directors was called to order at
approximately 7:30 p.m. by Stacey Cohen, President.
Board members in attendance:
Robert Boynton, Joseph Cann, Marjorie Cannon,
Stacey Cohen, Nora Colford, Natalie Hendrix, and Angelo
Morelli. Joseph Skonieczny was
absent. Michael D’Angelo was
available by phone. Linda Romolo
attended from Wentworth Property Management.
1)
Minutes: Minutes of
the March 23, 2010 meeting were approved. Minutes
of the February 23, 2010 meeting were previously distributed and approved by
email.
2)
Maintenance update from super:
Chris Brighina joined the meeting to report on building maintenance items
and concerns.
3)
Financial Report:
a) Unit Owner
Arrears. Status of legal actions
were discussed.
b) Operating and
Capital Reserve Account balances were reviewed.
c) Audit for
FY2009: The FY2009 audit with
Wilken & Guttenplan continues. At
last meeting D’Angelo requested that Romolo call auditor to help them gain
access to Wentworth records. There
was no update at this meeting as to whether Romolo had spoken with auditor.
d) FY2010 Budget:
Draft was distributed and corrections made.
Romolo will re-distribute for Board comment/approval.
4)
Legal Report:
a) Rules &
Regulations: Management has
notified unit owners and requested
compliance with the
new building rule requiring unit owners and tenants to provide proof of
liability insurance coverage. It was
noted that the declaration page should offer sufficient proof for management
records. Only 17 (of 67) units have
complied with request. Romolo will
take additional action.
b) Local Law 11 façade inspection (cycle 6):
Romolo still in process of re-submitting the Cycle-6 engineering report
for Local Law 11.
c) Unit Leases:
All leases on file with management are current.
d) Management
contract renewal: Contract for
Wentworth Property Management being reviewed.
Will require board approval prior to signing by President.
Romolo was to distribute contract following February meeting for
review/discussion. No update at this
meeting.
e) Laundry room contract renewal: Contract for CoinMach was distributed by management for review/discussion. Questions were raised concerning monthly income, signing bonus, type of machines, new machines, and other disparities between the two proposals. Romolo will get CoinMach to revise their proposals for clarity.
6)
Building Repair & Maintenance Report:
a) Exhaust
fan system:
Kitchen ventilation duct is not blocked however bathroom line is not
balanced and believed to be overpowering kitchen line.
Chris will get electrician to propose additional or different rheostat.
b) Semi-annual smoke
detector replacements and unit inspections:
Chris Brighina will begin Spring 2010 unit
inspection and smoke detector replacements.
c) Replacement/upgrade
of exterior and lobby lighting timers: Light
sensors will replace timers next week.
d) Parking lot:
repairs: From the September
board meeting, Linda Romolo was to get bids for parking lot sealing and
resurfacing for the board’s information and future consideration.
Romolo provided bid for resurfacing at March meeting, but no bids were
presented for just sealing. No
update at this meeting.
e) Plumbing
break in drain pipe: Chris
reported that plumber has inspected the line front drain with camera and found
pipe to be intact. Possible problem
with lawn sprinkler line as lawn continues to sink in the area.
f) Garage door
operation: Overhead door does
not automatically stop and reverse when encountering an obstruction in its path
while closing. Bids requested for
re-locating interior electric eye and adding additional exterior eye.
No update at this meeting.
g) Entrance area tile
cracks: There was discussion of
entrance tile repair options. Recommendations
being discussed with contractors.
h) Lobby ceiling:
Brighina has purchased replacements for the
smaller access plates and anticipates installation next week.
Larger/custom ones not available and will require more creative
solutions.
i) Carpeting
replacement: Romolo and Cohen
investigating replacement of damaged carpeting.
No update at this meeting.
j) Fire Escape
repairs: Romolo reported fire
escape repairs (welding) to be completed next week.
k) Landscaping:
Cohen will be meeting with new lawn contractor for bush and tree trimming
and replacement proposals. No update
at this meeting.
l) Exterior
water infiltration: Chris
reported that several unit owners on the fifth floor have reported exterior
water leaks near windows. There
was discussion of previous lintel and brick work at the building. Investigation
continues.
m)
Entrance Intercom system:
On account of the FiOS upgrades and unit owners converting to other
service providers, the entrance system intercom wiring has been compromised and
is no longer functional for several units. The
board approved $1,600 to convert entrance system to direct-dial – meaning that
when guests arrive at the building and call up a unit through the entrance
system, the system will dial a normal 10-digit number.
Unit owners will need to provide a telephone number.
Boynton
and Morelli dissented on account of unit owners with only cell phones will need
to provide their cell phone numbers for the entrance system – meaning that
entrance system calls will be directed to their cell phones and they will
receive calls from the entrance system while at work or traveling elsewhere
outside the building. In the case of
a couple no land-line and two cell phones, the couple would need to determine
which of their cells phones would be the telephone number dedicated to receiving
entrance system calls.
The