Highview Condominium II
Board of Directors - Meeting Minutes
May 3, 2016  7:30 p.m.
 

 

The ninth regular meeting of the 2015-2016 Highview Condominium II Board of Directors was called to order at approximately 7:30 p.m. by Sindhu Mathew, President.  Board members in attendance: Robert Boynton, Joseph Cann, Marjorie Cannon, Bernard Davis, Joan Desantis, Rosanna Fernandez, and Sindhu Mathew.  Board members absent:  Michael D'Angelo and Madalina Rauscher.  Marissa Zinnanti attended from Carriage House Property Management. 

1)   Minutes:  Minutes of the 03/22/15 board meeting were approved. 

2)   Building Repair & Maintenance:

      a)    Front entrance refinish of doors/windows bids:  South Shore Glass scheduled to install lobby glass and doors this week.

      b)   Garage floor:  Cracked repaired today by Milano.  Awaiting sealant bids for spring/summer work.

      c)    Spring unit inspections:  Super has started Spring 2016 unit inspections and smoke detector battery replacements.

      d)   TV antenna:  Repair completed by Quality Antenna.

      e)    Property survey:  Survey completed to determine 830/850 boundary in advance of sidewalk replacement.

      f)    Front Island shrubbery lighting:  Electrical contractor anticipates completing project on Saturday.

      g)   Water infiltration /masonry repairs: Completed on north end of building (all three sides of "C" line units) and front ("A" line).  Contractor still to address leaks in "G" and "E" lines.

      h)   Front shrubbery area:  Board approved $400 labor plus cost of 6" diameter pressure treated landscape logs for Musa to terrace area.

      i)    Stairwell painting: Board approved bid of $3,600 including labor and materials for Musa to repaint stairwell wall, ceiling, and floors.  All work to be performed outside of normal work hours.

      j)    Compactor room - toilet installation:  Design work by Salamon Engineering completed and approved by City.  Plumber being scheduled per their previously approved bid.

      k)   North-sidewalk, northeast-front sidewalk, service stairwell, and various curb and flag replacements:  Management has received bids, but specs from contractors not all the same.  Boynton will review specs with Marissa so she can ask contractors to clarify their bids.

      l)    Elevator:  Slade Elevator bidding on elevator cab renovation.  Slade recommended consideration of mechaniocal upgrade on account of age.  Board requested Marissa review when VSA last evaluated condition of elevator's mechanical systems.  Board also asked management to seek additional vendor to bid of cab renovation.

      m)  Stairwell and hallway signage:  Sindhu and Rosanna selecting new stairwell and Lobby signage.  Signage to include warning for opening of stairwell door at Lobby (both inside and outside of stairwell), signage on all floors to indicate units left and right of elevator, no soliciting, and management contact. 

      k)   Wallpaper and carpet replacement:  Contract signed.  On hold pending building loan.

      l)    Electrical back-up - generator system:  Awaiting completion of design work by Salamon Engineering.

      m)  Security upgrades/repairs:  Remainder of repairs holding pending building loan.

      p)   Parking lot resurfacing:  No update. 

      b)   Time Clock operation:  Management asked to begin using the Time Clock to monitor weekend super's hours. 

      f)    Stairwell door - broken glass:  Cracked window pane on first floor fire door being replaced. 

3)   Financial Report:

a)    Account balances:  Reviewed.

b)   Unit arrears:  Board reviewed unit arrears with managing agent.

c)    Building Loan:  Empire State Bank approved $400,000 building loan on 03/30/16.  Letter sent to unit owners on 04/11/16 providing 30-day notice and decision forms.  According to the approval, Empire was only able to provide two loan options to unit owners instead of the initial three options requested.  The two options available to unit owners are total pre-payment of unit share by 05/13/16 or participation in full 5-year loan.

d)   Audit for FY2015:  Work on the FY2015 audit by Louis Picaro of Sciarrino Kindya & Co. and Financial Solutions Group continues.

e)    Monthly financial reporting:  Financial report format discussed.  Still needs to reflect budgeted versus actual by cost center for month and YTD, as well as budgeted funds remaining in various cost centers.  Progress, but not adequate.  Boynton will discuss with Madalina Rauscher (Treauser) so she can follow-up with Management. 

4)   Legal Report:

a)    Unit liens:  Discussed.

b)   NYC code violations:  The 2012 DOB building violation remaining open/active.  Awaiting engineering report by Salamon Engineering to satisfy compliance

c)    Lease compliance:  Violations and monthly fines reviewed.

d)   Insurance compliance (leased units/tenant coverage):  Violations and monthly fines reviewed.

e)    Insurance compliance (owner coverage):  No report available from management.

f)    Insurance claim:  Possible claim against the building discussed.  Not certain whether claim is against 830 Howard Ave. or 850 Howard Ave.  No update.

g)   Contact information for unit 3-D and 4-G:  Discussed status of emergency and legal contact information reviewed.  Management locating NYC's tax mailing address for unit 4-G and haqs sent Certified letter requesting response.

      h)   Water conservation - NYC initiative. 

5)   Summary review of meeting's action items:  Not reviewed. 

The meeting was adjourned at approximately 9:30 p.m.  Minutes submitted by Robert Boynton, Secretary.