2)
Minutes: Minutes of
the May 26, 2009 meeting were approved.
3)
Financial Report:
a) Unit Owner Arrears
were discussed. Legal action
continues with units 1-B, 2-J, and 6-C.
b) Building’s account
balances with Wentworth reviewed.
c) Reserve accounts:
Move completed from Chase to Citibank of all reserve funds.
Signers are the board’s four officers.
Two officers required for withdrawals.
d) Audit for FY2008:
Completion expected in September.
4)
Legal Report:
a) Local Law 11 façade inspection (cycle 6):
Romolo is investigating the building’s submission of Cycle-6
engineering report for Local Law 11. The
City of New York continues to indicate that the report has not been filed with
the City. Accordingly the City has
not performed their final inspection for completion of Cycle-6.
Romolo reported that she will be going to court on July 17th
in reference to the issue.
b) Unit Leases:
Romolo indicated that all unit owners are currently in compliance with
Highview’s lease approval and renewal requirements.
c) Website Resources:
Joanne Hernandez has completed check-list of lease and sale items
required for board waivers. Forms
themselves are still being reviewed. Boynton
working with Joanne Hernandez.
d) Insurance review:
Judyth Minale has not received a complete copy of the building’s
insurance policy for review. This
was requested from management in February. Linda
Romolo will forward contact information by email to Boynton and he will request
copy of complete policy directly from the insurance provider.
e) Street
construction on Clove Road: There
was discussion of the street construction and possible damage to the building.
Reports of cracks in structural walls were discussed and will be
investigated by management.
5)
Building Repair & Maintenance Report:
a) Exhaust
fan system: Board
voted to authorize Boynton to work with the super in determining and correcting
any issues of blockages, unauthorized unit owner fan installations, and fan
operation problems noted in 05/13/08 inspection by
contractor.
Management was unsuccessful in following up since the May 2008
inspection.
b) Elevator condition
status: There was no update on
the elevator problems that have remained unresolved for several months.
c) Painting projects:
Brighina will work to complete painting
of unit doors and common area doors. Project has been on hold pending hiring of
new building super.
d) Garage floor
plates: There
was no update on the replacement of the sewer cap in garage floor.
Boynton was authorized by board to follow up with super.
e) Spring semi-annual
smoke detector and CO2 detector battery replacements:
Brighina will complete.
f) Hallway
lighting: Chris Brighina
will work to complete. Had
been on hold pending hiring of new building super.
Noted at this meeting that Chris needs management to order more light
bulbs.
g) Parking lot crack
repairs: Chris Brighina
will work to complete. Had
been on hold pending hiring of new building super.
Boynton purchased patching materials and Chris has repaired several of
the major cracks.
h) Laundry room
mounting of digital television converter:
Boynton reported that digital converter has been installed by Chris.
i) Boiler
circulation pump #2 replacement: It
was reviewed that the pump needs to be replaced by fall.
No progress with estimates. Joe
Cann will be involved with project, but Wentworth to get contractor estimates.
j) Landscaping:
Tree trimming approved for trees on Howard Ave. side of building.
Super will spread mulch on remaining areas of shrubbery.
k) Exit signage:
Exit signs were replaced on the 6th floor and lobby level fire
door.
l) Maintenance
logs: Chris was asked to
maintain a log book exclusively for the elevator; indicating all reported
anomalies to be reviewed with the elevator maintenance contractor on their
monthly visit. This book is in
addition to the guest book he currently maintains which indicates all contractor
and maintenance visits to the building.
m) Plumbing investigation:
There was discussion of the water leak in the basement garage and the
possibility that a previously identified drainage pipe in front of the building
has broken again. Ground has
collapsed in the area by several inches. Management
will investigate.
The meeting adjourned at