August 25, 2016  7:30 p.m.
 

 

The thirteenth regular meeting of the 2015-2016 Highview Condominium II Board of Directors was called to order at approximately 7:30 p.m. by Rosanna Fernandez, Vice President. 

Board members in attendance: Joseph Cann, Marjorie Cannon, Joan Desantis, Bernard Davis, Rosanna Fernandez, and Madalina Rauscher.  Board members absent: Robert Boynton, Michael D'Angelo, and Sindhu Mathew.  Marissa Zinnanti attended from Carriage House Property Management. 

1)   Minutes:  Minutes from the 07/26/16 were not available for approval. 

2)   Building Repair & Maintenance:

a)   Garage floor painting/sealing:  Awaiting bids.

b)   Spring unit inspections:  Still to complete inspection of unit 4-G.

c)   Water infiltration /masonry repairs:  Work on leaks in "G" and "E" lines on hold pending review of results on recently completed work.  KES repaired outside leak this week in 4-C and will wait until heavy rain to reassess, in the meantime management will arrange for Musa will repair water damage inside apt 4-C.

d)   Stairwell painting: Board approved bid of $3,600 including labor and materials for Musa to repaint stairwell wall, ceiling, and floors.  All work to be performed outside of normal work hours.  Work to begin after hallway renovations are completed by contractors.

e)   Compactor room - toilet installation:  Toilet installed.  Exhaust fan required per City, although was not needed in the original engineering design plan approved by City.  Solomon Engineering going to Court on October 5 and Milano will install exhaust fan after Solomon resolves violation.

f)    North-sidewalk, northeast-front sidewalk, and various curb and flag replacements:  Management had received bids, but specs from contractors not all the same.  Boynton reviewed specs with Marissa so she can ask contractors to clarify their bids.  No updated bids at this meeting.

g)   Landscaping:  Musa to remove dead shrubs and plant mums in the potters in front of building.

h)   Elevator:  Slade Elevator bidding on elevator cab renovation.  Slade recommended consideration of mechanical upgrade on account of age.  Board requested Marissa review when VSA last evaluated condition of elevator's mechanical systems.  VSA inspected and deficiencies found.  Marissa trying to schedule repairs with Slade to address violations.  Marisa has attempted to contact Slade Elevator to provide bids for cab renovation as well and schedule elevator repairs (50 days to repair violations. Marissa said she will stop paying the premiums on our contract until they respond.  Board also asked management to seek additional vendor to bid of cab renovation.  Marissa getting  a bid from Milano for elevator cabin renovation (side panels and floor).  No other update at this meeting.

i)    Stairwell and hallway signage:  Sindhu and Rosanna selecting additional new hallway signage for all floors to indicate which units left and right of elevator, as well as new lobby signage indicating no soliciting, and management contact info for lobby.

j)    Wallpaper and carpet replacement:  Wallpaper and painting tentatively scheduled for September 26th.  Carpeting and tile tentatively scheduled to begin October 26th.  Replacement of light fixtures and electrical bids still in review.

k)   Electrical back-up - generator system:  Awaiting completion of design work by Salamon Engineering.

l)    Security upgrades/repairs:  Phase II work completed.  Phase III on hold pending completion of other Capital projects.

m)  Parking lot resurfacing:  Possible contractor was to attend previous board meeting with presentation, but had to postpone.  Has not been rescheduled.

n)   Service Entrance Stairwell:  Ultimate Pavers approved to rebuild stairwell for $4,200 bid.

3)   Financial Report:

a)   Account balances:  As of 08/25/16, Operating Account $29,880; Capital Account $124,861; Citibank Account $250,000 (which includes approx. $50,000 balance for ALX and another 50,000 to be set aside for water infiltration repairs on E and G lines). The first loan payment is due October 1st. Total loan amount $190,960.

b)   Unit arrears:  Board reviewed unit arrears with managing agent.

c)   Building Loan:  Loan closed on 08/22/16 and participating unit owners will begin receiving the monthly charge for their shares on October 1, 2016 statements.  In addition to the loan's direct monthly costs and bank's closing fees, the participants will share Highview attorney's fees for the loan totaling $2,200.  All costs divided by participants according to their proportional unit points.

d)   Audit for FY2015:  Work on the FY2015 audit by Louis Picaro of Sciarrino Kindya & Co. and Financial Solutions Group has been completed.  Once reviewed and accepted by the Board, General Membership will be held.  Annual meeting tentatively scheduled for October 11, 2016.

e)   Monthly financial reporting:  Financial report format requires revision to reflect budgeted versus actual by cost center for month and YTD, as well as budgeted funds remaining in various cost centers.  Madalina Rauscher (Treasurer) to discuss with Anthony. 

4)   Legal Report:

a)   Unit liens:  Discussed.

b)   Unit Arrears:  Discussed.

c)   Coinmach contract:  Discussed.  Coinmach in violation of contract according to Highview's attorney.  Current contract was signed 2013 for 8-year term.

d)   NYC code violations:  One active ECB building violation remaining open/active.  No update at this meeting.

e)   Lease compliance:  Violations and monthly fines not available for review at this meeting.

f)    Insurance compliance (leased units/tenant coverage):  Not available for review at this meeting.

g)   Insurance compliance (owner coverage):  Not available for review at this meeting.

h)   Emergency contacts:  Noted that management to maintain a list of emergency contacts for all units including daytime/evening/work contact for unit owners and tenants, as well as individuals and contact for individuals to be contacting in case of emergency (other than the resident).  Secretary indicated he has not received a copy of this from new management.  No update since last meeting.

i)    Water conservation - NYC initiative:  No update. 

5) Laundry Room Carts: There have been numerous complaints regarding residents taking laundry room carts for extended periods of time. In some instances, there have been no carts in the laundry room for longer than 24 hours. Management will send a letter to all residents indicating that carts taken from the laundry room should be returned within 15 minutes. The carts, which are provided by CoinMach solely for laundry handling, have also been found to be dirty or greasy from residents using the carts to transport deliveries from their cars into the building and garbage out of the building. Clean laundry has been damaged/stained by the alternate uses of the laundry carts. Management will post a notice laundry room regarding removing carts for extended period of time and appropriate usage. Issue will be revisited if the notices do not deter people from removing and not returning them clean in a timely fashion.
 
6)   NYC Water Conservation Initiative: No update. 

7)   Summary review of meeting's action items:  Not reviewed. 

The meeting was adjourned at approximately 9:00 p.m.  Minutes submitted to Secretary by Rosanna Fernandez, Vice President.