Highview Condominium II
Board of Directors - Meeting Minutes
September 24, 2013  7:30 p.m.

 

The third meeting of the 2013-2014 Highview Condominium II, Inc. Board of Directors was called to order at approximately 7:30 p.m.  

Board members in attendance: Robert Boynton, Joseph Cann, Marjorie Cannon, Stacey Cohen, Nora Colford, and Natalie Hendrix.  Board members absent: David Cutler, Michael D'Angelo, and Joseph Skonieczny.  Maria Arzano attended from Wentworth Property Management.  

1)   Minutes:  Minutes of the July meeting were deferred for email approval.  

Maintenance update from super:  Chris Brighina was on vacation, but written report on building maintenance submitted.  

2)   Building Repair & Maintenance Report:  

a)   Water infiltration:  Interior repairs from prior water damage have all been be completed by Chris Brighina except one unit.  

b)   Exterior masonry repairs:  Discussion of bidders continued.  Anticipate revised contract and approval by 10/15/13.  

c)   Garage masonry repairs: At 04/03/13 meeting, building super indicated that he would replace the collapsing floor drain covers near both the side door and overhead door immediately.  Liability concerns remain.  Getting bid from masonry contractor who will do the upcoming exterior work.  

d)   Entrance area repairs:  Questions raised about surfacing materials.  No update.   

e)   Drain pipe repair:  Repair of drain pipe near Howard Ave. sidewalk has been completed.  

f)    Repairs to super's apartment:  Header has been installed in wall opening above kitchen counter.  

g)   Fall 2013 unit inspections:  Super will begin fall unit inspections and battery replacements while determining any evidence of new exterior water infiltration.  

h)   Installation of backflow restrictor and water filtering:  Installation in progress.  Unit owner (L-K) expressed concern for whether filtering system would correct the sediment /blockage situation and noted the considerable inconvenience suffered with inoperable bathroom faucets over extended periods of time.  Board expressed intention that the new filtering system now being installed should resolve problem.  

i)    Laundry room contract:  Laundry room contract was approved by email vote.  CoinMach expected to install new machines and renovate room in 90 days.  

j)    Carpet cleaning:  Noted that carpets should be cleaned by Stanley Steamer before Thanksgiving for the holidays.  

k)   Electrical back-up systems:  No update at this meeting from Skonieczny.  Arzano will also get bids.  

l)    Wallpaper and carpeting replacement:  Bids submitted.  Need to determine materials.  

3)   Financial Report  

a)   Unit arrears:  Board reviewed unit arrears with managing agent.  

b)   Special Assessment:  Noted that after allowing 25% for Operating Reserve, Capital Reserve balance is approximately $162,000; $90,000 short of the $250,000 balance mandated by General Membership resolution.  Discussed possibility of special assessment in FY2014 to restore balance.  Also noted that building will be initiating additional exterior repairs shortly.  

4)   Legal Report:  

a)   Local Law 11 facade inspection (cycle 6) and Local Law 11 facade inspection (cycle 7):  No update.  

b)   Violations on websites:  Noted that there are a number of building code violations that remain open.  Arzano will investigate and act to gain closure of each.  Noted that the number of outstanding violations against the building had delayed a unit’s sale.  

c)   Lease compliance:  No update at this meeting.  

d)   Insurance compliance:  No update at this meeting.  

e)   Building damage from traffic accident:  Insurance claim in process.  

The meeting was adjourned at approximately 9:00 p.m  