Highview Condominium II
Board of Directors - Meeting Minutes
September 27, 2011  7:30 p.m.

The fifth meeting of the 2010-2011 Highview Condominium II, Inc. Board of Directors was called to order at approximately 7:30 p.m. by Stacey Cohen, President.  Board members in attendance:  Robert Boynton, Joseph Cann , Marjorie Cannon, Stacey Cohen, Nora Colford , David Cutler , Natalie Hendrix , and Joseph Skonieczny.  Michael D’Angelo participated by telephone.  Linda Romolo attended from Wentworth Property Management.  

1)   Minutes:  Minutes of the May 23, 2011 meeting were approved prior to this meeting by an email vote.  

2)   Water infiltration:  Following the May 23, 2011 meeting with SMS Engineering, it was agreed that Joe Cann and Joe Skonieczny would meet with Linda Romolo and Becht Engineering.  Although Becht came to the building, Joe Cann and Joe Skonieczny were neither advised of the meeting nor its outcome.  

      On account of the urgency expressed by affected unit owners, Cohen recommended that Board approve the bid from SMS without further delay.  Since SMS had estimated cost of work in excess of $300,000 for 30 individual leaks in thirty units (replacing all brickwork and AC sleeves between two vertical windows), Boynton suggested that considering the potential cost of this extensive work the board should not rely on the opinion of a single engineer and a minimum of three engineering should review the situation and offer bids.  D’Angelo concurred.  Romolo will get additional engineering bids and discuss their strategies.  

      It was also questioned whether completion of the Local Law 11 – Cycle 7 Inspection would add any additional exterior repairs that might need to be performed at the same time.  In addition to the outcome of the Local 11 inspection, several residents have reported new wall cracks in their units following the summer’s earthquake and Brighina’s Fall 2011 inspection may discover additional window leaks to be added to the inventory of repairs to be contracted.  

      As noted at the May meeting, the estimated cost of masonry work will be unknown until contractor bids received, but with the first engineer’s review suggesting $7,000-$10,000 per leak, the cost might be expect to be in the range of $200,000 - $300,000 for the 30 leaks confirmed in the spring.  There was a brief discussion of the Special Assessment required to fund the work, but discussion was tabled until engineer is contracted to determine scope of work and masonry contractor bids are reviewed for selection.  

Maintenance update from super:  Chris Brighina joined the meeting to report on building maintenance and concerns.  

3)   Building Repair & Maintenance Report:  

a)   Emergency Lighting:  Brighina reported that he has completed inspection of the emergency lighting and made a number of unit replacements.  However he noted that during the recent hurricane numerous emergency lights still failed after a short period of time.  He will be re-inspecting in the weeks ahead.  Noted that the emergency lights are for immediate evacuation and not for extended electrical outages.  Also noted that without emergency lighting, hallways and stairwells are totally dark.  

      b)   Carpet cleaning:  Romolo reported that the carpets were cleaned after the May meeting and will be cleaned again before Thanksgiving.  

      c)   Garage Stairwell Door:  No update.  At the May meeting, Romolo was asked to get estimates for replacement of the garage stairwell door and an email vote would be conducted to approve the work.  It was noted that the door rusted out at the bottom and a kick-plate was installed several years ago to hide the deterioration.  At this point, the door is shifting and garage residents have repeatedly reported being unable to open the door for access to their cars.  On account of the urgency of this matter and four month delay, the Board approved single estimate from Minkel Locksmiths per super’s conversation with the locksmith.  

      d)   Sprinkler System Inspections:  At the 02/02/11 meeting, Brighina reported that a flow test of the garage sprinkler system had been performed by the Fire Department and questions were then raised by the board about inspection of the compactor and laundry room sprinkler systems.  No update from Romolo at the 02/22/11 or at the 04/26/11 meeting when Romolo indicated that she continues to investigate.  At the May 23, 2011 meeting, Romolo indicated that the inspections would be completed in June.  As of this September meeting, the inspections had not been performed.  

      e)   Stairwell painting estimates:  It was noted that at previous meeting Romolo was to get estimates for stairwell painting.  No estimates at this meeting.  Since the work requires ventilation it will be held until spring.  Romolo was asked to get written estimates by the next meeting for incorporation in FY2012 budgeting, noting that the prices will not go up by spring as painting contractors are hungry for the work.  

      f)    Parking lot crack repairs:  Building super Chris Brighina will repair cracks before winter.  

      g)   Entrance area tile crack and grout repairs:  Building super Chris Brighina will make repairs before winter.  

      h)   Sewer line cleaning:  Romolo provided bids for quarterly sewer line cleaning contract.   Board compared bids and noted differences in the proposed scope and method of cleaning – questions raised about pressurized cleaning, whether cleaning was to street, and how many feet back from front wall clean-out.  Romolo will get answers to all questions by next meeting.  Romolo will also ask Rapid Sewer to amend their proposed contract to include sewer line to laundry room.  

      i)    Water supply filtering for unit L-H:  It was noted that the building has repeatedly assumed costs of emergency plumbing repairs and replacement of bathroom and kitchen water supply fixtures damaged by sediment in water lines.  Similar blockages have been reported in units L-H, L-C, and L-D in recent years; requiring replacement of water supply lines to unblock the lines after other remedies used by plumber failed.  Skonieczny volunteered to meet with plumbers and propose a filtering remedy for unit L-H at next Board meeting.  

      j)    Tree pit hazard:  Romolo was asked to write a letter to the management of 830 Howard Ave. (Highview I) requesting that they address a trip hazard situation affecting the safety of Highview II residents.  The tree pit along the sidewalk in front of our building, just beyond (up the street) Highview II property, has been allowed to erode six inches below sidewalk grade; presenting a trip hazard for people parking/walking in front of Highview II.  It was noted that past management has written letters to Wagner College and they have corrected erosion problems affecting parking and safety of Highview II residents.  

      k)   Weekend super:  It was noted that the weekend super’s hours are 8:00 a.m. – 12:00 p.m.  Although the weekend super shows up eventually, sometimes as late as the afternoon, his 8:00 a.m. start time is set to the needs of the building; assuring that residents will start their Saturday and Sunday morning with a clean building.  

            It was also noted that management stipulates an interior/exterior inspection of the common pathways and a quick cleanup of litter and overnight debris around the building as the day’s first maintenance priority – in advance of processing compactor garbage.  It was noted that often the building’s debris and spills are ignored until after the weekend super has spent hours in the compactor room.  Management was asked to review the priority list with weekend super and provide a written copy of the schedule/priority list with the Board to assure that there is no disagreement.

4)   Financial Report:  

      a)   FY2010 audit:  The completed FY2010 audit by Wilken & Guttenplan was approved by an email vote and the annual meeting has been set for October 26, 2011.  

5)   Legal Report:  

      a)   Local Law 11 façade inspection (cycle 6) and Local Law 11 façade inspection (cycle 7):  Romolo indicated that although Cycle-6 preliminary report has been submitted to the City, there is no update from the City of filing.  

            At the May board meeting, Romolo reported that Becht Engineering would be performing the Cycle-7 pre-inspection engineering work next week.  At this meeting, status of Cycle-7 submission and final inspection by NYC Building Department unknown.  Another engineering firm indicated to Romolo that the Cycle-7 has not been filed.  Noted by Board that Romolo indicated she had not spoken with Becht Engineering since March 2011, but she believed that follow-up was complete responsibility of Becht, not Wentworth.  Board members disagreed.  Current status of Cycle-7 unclear.  

            Romolo provided new engineering bid for Cycle-7 inspection.  Boynton questioned why getting additional bid now for a Cycle-7 and asked for confirmation as to whether Becht Engineering had already been paid to perform the work.  Romolo confirmed that Becht had been paid.  Since Romolo was now recommending a new contract for same work, Boynton questioned if vendor was at fault why Romolo was not proposing legal action to recoup the several thousand dollars already paid.  Situation unclear.  

            Clarification requested by Board member concerning why management continues to refer to Fall 2010 filing of Cycle-6, while NYC Commissioner’s Order received by Wentworth in August 2010 indicated that Highview II was requested by the NYC Buildings Department to file an acceptable Cycle-7 report within 30 days (letter dated August 27, 2010) and once the Cycle-7 report was accepted, the building would be credited for both Cycles 6 and 7.  No indication from Romolo why action to comply with the Commissioner’s Order was not taken by Wentworth.  

      b)   Lease rule violations:  Romolo indicated that all leases are up-to-date.  

      c)   Insurance rule violations:  Romolo indicated that all units are up-to-date.  

The meeting was adjourned at approximately 9:30 p.m.  

Minutes submitted by Robert Boynton, Secretary.