Highview Condominium II
Board of Directors - Meeting Minutes
September 27, 2016  7:30 p.m.
   

 

The thirteenth regular meeting of the 2015-2016 Highview Condominium II Board of Directors was called to order at approximately 7:30 p.m. by Sindhu Mathew, President. 

Board members in attendance: Robert Boynton Joseph Cann, Bernard Davis, Joan Desantis, and Sindhu Mathew.  Board members absent: Marjorie Cannon, Michael D'Angelo, Rosanna Fernandez, and Madalina Rauscher.  Siobhan Hickey attended from Carriage House Property Management. 

1)   Minutes:  Minutes from the 08/25/16 meeting were approved. 

2)   FY2015 Audit:  The Board reviewed FY2015 audit with Louis Picaro of Sciarrino Kindya & Co.  Board accepted audit with minor edits.  Picaro will attend General Membership meeting on 10/11/16 at 7:30 p.m. to review audit with all unit owners. 

3)   Building Repair & Maintenance:

a)   Garage floor painting/sealing:  Awaiting bids.

b)   Fall unit inspections:  Beginning.

c)   Water infiltration /masonry repairs:  Work on leaks in "G" and "E" lines to begin as soon as bids reviewed.  Urgency in completion before winter.

d)   Stairwell painting: Work to begin after hallway renovations are completed by contractors.

e)   Compactor room - toilet installation:  Toilet installed.  Exhaust fan required per City, although was not needed in the original engineering design plan approved by City.  Solomon Engineering going to Court on October 5 and Milano will install exhaust fan after Solomon resolves violation.

f)    North-sidewalk, northeast-front sidewalk, and various curb and flag replacements:  Contractor will meet with Board members on 10/28/16.

h)   Elevator repairs:  Completed.

i)    Elevator Renovation/Upgrades:  Slade Elevator bidding on elevator cab renovation.  Slade recommended consideration of mechanical upgrade on account of age.  No update since initial meeting. Marissa getting a bid from Milano for elevator cabin renovation (side panels and floor).  No other update at this meeting.

j)    Wallpaper and carpet replacement:  Wallpaper and painting tentatively scheduled for September 26th.  Carpeting and tile tentatively scheduled to begin October 26th.

k)   Electrical back-up - generator system:  Awaiting completion of design work by Salamon Engineering.

l)    Security upgrades/repairs:  Phase III on hold pending completion of other Capital projects.

m)  Parking lot resurfacing:  Contractor will meet with Board members on 10/28/16.  Urgency to complete before winter.

n)   Service Entrance Stairwell:  Completed by Ultimate Pavers for $4,200 bid.  

3)   Financial Report:

a)   Account balances:  As of 09/27/16, Chase Operating Account $153,763.58; Empire Operating Account $9,718.83; and Citibank Reserve Account approx. $250,000.

b)   Unit arrears:  Board reviewed unit arrears with managing agent.

c)   Audit for FY2016:  Contract for FY2016 with Louis Picaro of Sciarrino Kindya & Co. and Financial Solutions Group was authorized.

d)   Monthly financial reporting:  Financial report of 07/31/16 indicates that several costs centers are in deficit. Noting that with six months of year remaining, utilities were already $10,000 in deficit.  Other areas such as salaries, insurance, and also in deficit. The report did not indicate total of remaining funds and anticipated/budgeted expenses for remaining 6 months of year. Concern expressed for the uncertainly and potential for a FY2016 operating deficit. 

4)   Legal Report:

a)   Unit liens:  Discussed.

b)   Unit Arrears:  Discussed.

c)   Coinmach contract:  Discussed.  Coinmach in violation of contract according to Highview's attorney.  Current contract was signed 2013 for 8-year term.

d)   NYC code violations:  One active ECB building violation remaining open/active.  No update at this meeting.

e)   Lease compliance:  Violations and monthly fines not available for review at this meeting.

f)    Insurance compliance (leased units/tenant coverage):  Reviewed.

g)   Insurance compliance (owner coverage):  Reviewed.

h)   Emergency contacts:  Management will have super update during Fall inspections.

i)    Water conservation - NYC initiative:  No update. 

6)   NYC Water Conservation Initiative: No update. 

7)   Summary review of meeting's action items:  Not reviewed. 

The meeting was adjourned at approximately 9:00 p.m.  Minutes submitted by Robert Boynton, Secretary.