Highview Condominium II
Board of Directors - Meeting Minutes
September 28, 2015  7:30 p.m.
 

 

The second regular meeting of the 2015-2016 Highview Condominium II, Inc. Board of Directors was called to order at approximately 7:30 p.m. by Sindhu Mathew, President. 

Board members in attendance: Robert Boynton, Joseph Cann, Marjorie Cannon, Joan Desantis, Rosanna Fernandez, Sindhu Mathew and Madalina Rauscher.  Board members absent:  Michael D'Angelo and Natalie Hendrix Lombardo.  Siobhan Hickey and Marissa Zinnanti attended from Carriage House Property Management. 

1)   Board resignation and appointment:  On 09/11/15, Donald LaPalme resigned from the Board with the sale of his unit.  Joan Desantis was appointed to fill the vacancy by a majority vote of the board completed by email on 09/22/15.  Her appointment will be valid until the next annual General Membership meeting of unit owners at which time the position will be filled by election of the General Membership. 

2)   New Building Superintendent:  Musa Islami completed his 90-day probationary period on 09/08/15 and the Board authorized his occupancy of apartment unit L-K.  He will be moving in by the end of this week. 

3)   Building Repair & Maintenance:

a)    Fire escape - welding and painting bids:  The previous single bidder has removed himself from consideration.  Management seeking new bids and has found one wishing to bid on both the welding and painting.  Anticipate formal bid later this week.

b)   Foundation crack repairs:  Repair bid was approved at August meeting and contractor, Tan Interiors, has received deposit.  Contractor is attempting to coordinate with design engineer for the project, Salamon Engineering.

c)    Parking lot resurfacing:  Bid tentatively approved at August meeting., while questions remain concerning milling process.  Seeking feedback from Salamon Engineering as four contractors each recommended different work.

d)   Front entrance area sidewalk and pillar crack repair bids:  Bid received and discussed.  Will seek additional bids.

e)    Front entrance refinish of doors/windows bids:  Bid received for refinishing doors to original condition.  Boynton requested discussion with contractor concerning explanation of process.

f)    Wallpaper and carpet replacement:  All A and B line bathrooms (floors 1-6) were inspected with the exception of unit 3-A who has refused to provide access over six months of engineering and management investigation.  Installation will move ahead and unit 3-A will receive legal notice that if any water damage occurs in hallways, he may be held liable for cost of hallway repairs.  Noted that the contract signed around February called for completion by July 1st.  On account of the delay caused by unit owner, there may be increased cost of materials.

g)   Compactor room - toilet installation:  Salamon Engineering has reviewed board's initial plan and indicated as feasible.  Board approved $3,000 for Salamon's design work, permits, filing fees, and final inspection sign-off.  Board approved Buttermark's construction bid.

h)   Electrical back-up - generator system:  Board approved $4,500 proposal from Salamon Engineering for design plans, filing fees, etc.

i)    North-end sidewalk &stairwell repairs:  Board reviewed Salamon Engineering's recommendation and approved plan.  No charge by Salmon for their recommendation.  Management will seek contractor bids for the work.

j)    Garage - French drain at garage stairwell doorway:  Water problem inside garage door discussed.  Area often wet from draining/replacing building's  water supply filters.  Super attaching hose to drain pipe and need for French drain on hold.

k)   Garage - concrete failure near entrance:  Tabled for next meeting.

l)    Water infiltration reports:  Several units have reported exterior water infiltration in window areas.  Repairs will be coordinated with any additional situations determined through fall 2015 unit inspections beginning next week.

m)  Security upgrades/repairs:  Board approved 09/24/15 proposal from Alarmingly Affordable for camera replacements, additions, and upgrades totaling $15,185 (including labor and supporting electronics).  Fernandez and Boynton recommended holding off on additional ~$5,000 and will work with Alarmingly Affordable to revise contract accordingly.

n)   Television antenna servicing:  Building's antenna service not functioning properly.  Servicing by Quality Antenna has been requested.

o)   Maintenance Committee:  Committee was reinstituted at this meeting and inspection reporting form reviewed.  Cann will coordinate boiler related issues.  Marissa will review boiler log post and posted documents in boiler room.

p)   Boiler servicing and repairs:  Circulation pumps have been repaired by JVC Electric.  Plumbing repairs/leaks contracted with PAC to begin.  Discussed that the building needs a comprehensive boiler service provider.  Presently Starr Boiler works on combustion issues, but not plumbing.  Cascade Water Treatment monitors water Ph balance.  System's circulation water system could possibly use flushing.  Review Salamon Engineering's report.

q)   Super's apartment:  Ready for move-in.

r)    Landscaping Committee:  Discussed dead tree, dead shrubbery, fall flower bulb planting, entrance area bench, exterior lighting, condition of sidewalks, and other exterior landscaping issues.  Board resurrected Landscaping Committee.  Cannon will chair.  Members include Cannon, Mathew, Boynton, Desantis, and Fernandez.

s)    Office computer:  Madalina Rauscher reported that the new computer has arrived and she will be installing software this coming weekend.

t)    Elevator breakdown and emergency response by Slade:  Marissa reported that she has been trying to contact Slade to discuss details of emergency telephone service responsibilities and compare to alternate providers. 

4)   Financial Report:

a)    Unit arrears:  Board reviewed unit arrears with managing agent.  As of 08/31/15, total is approximately $36,027 with liens presently on several units and additional liens anticipated in months ahead.  Both CoinMach and T-Mobile (included in the $36,027 balance) are also several months in arrears.

b)   Building Loan:  Comprehensive listing of repair and replacement estimates continue to be gathered.  Board Treasurer maintaining a current list.  Loan discussions with banks beginning.

c)    Reserve Account:  Signers on the Board's Capital Reserve account have been updated to current Board officers.

d)   Audit for FY2015:  FY20015 audit contract to be signed with Wilken & Guttenplan in October/November. 

5)   Legal Report:

a)    Unit liens:  Management will discuss status of units with building's attorney..

b)   Local Law 11 facade inspection (cycle 7):  Working with Salamon Engineering on fire escape repair bids.

c)    NYC code violations:  One DOB building violation indicated by City on their website as remaining open/active.  Management indicates violation is from 2012 and will require an engineering report.  Board approved Salamon Engineering to conduct the 2012 report required by NYC.

d)   Lease compliance:  Presently one unit in violation and receiving $500/mo. fine.

e)    Insurance compliance (owner coverage):  Discussed.  Thirteen units have no record of insurance coverage and an additional eleven have only indicated coverage which has expired.  All 24 units in violation receiving $50/month fines.

f)    Insurance compliance (leased units/tenant coverage):  Discussed.  Seven units have not provided record of tenant insurance coverage.  All seven units in violation and receiving $50/month fines.

g)   Insurance claim:  Possible claim against the building discussed.  Not certain whether claim is against 830 Howard Ave. or 850 Howard Ave.

h)   Contact information for unit 3-D and 4-G:  Discussed status of unit and legal contact information. 

6)   Summary review of meeting's action items:  Not reviewed. 

The meeting was adjourned at approximately 10:20 p.m 

-          Minutes submitted by Robert Boynton, Secretary.