Highview Condominium II The second meeting of the 2006-2007 Highview II Board of Directors was called
to order at 8:00 p.m. by Richard Re, President. Board members in attendance:
Victor Bellini, Miriam Biren, Robert Boynton, Marjorie Cannon, Anna Civitano,
Nora Colford, Al Lamoglia, and Richard Re. Board member absent: Stefanie
Greenberg. Irwin Chopak attended from J.A.L. Diversified Management. 1) Minutes: Minutes of the September 12, 2006 board meeting were
approved. 2) Capital Projects update: a) Roof rebuild update: The sign-off has not been completed. b) Exhaust fan repairs and duct blockages: Concerning reports that
apartments 1-H, L-D, and L-F are still blocked, the board recommended at the
September meeting that Chopak confirm that the lowest unit of each line be
inspected to confirm system’s operation. Chopak reported at this meeting
that the inspections have not been made. c) Lobby-level hallway lighting The new sample lighting fixture
approved by the committee is expected later this week. Once installed and
appearance is approved, six additional units will be ordered to replace the
other remaining fixtures. 4) Financial report: a) Refunds due to the unit owners who selected Option #1 last year (fall
2005 full payment in advance) will be made by the end of October. b) Owners who selected Option #2 (one year of interest with balance due
fall 2006) had until 09/22/06 to pay their balance. Three unit owners availed
themselves of this option. c) All other unit owners automatically defaulted to Option #3 (the full
five-year loan) and the five-year loan was finalized on October 1, 2006. d) $8,000 (surplus of the ~$300,000 unit assessments) was transferred to
Highview’s Capital Reserve account. 5) Legal report: a) Time Warner Cable installations: No update from Chopak concerning
the notices sent to four unit owners for improper installations by Time Warner
Cable and the corrective actions required. Chopak stated at the September
meeting that he would set up a meeting at the building with Time-Warner and
board representatives, but there was no progress to report at this meeting. b) Driveway parking: At the July board meeting, the board had
requested that Chopak forward a list of the towing services he had spoken with
and the policy of each relative to payment for the board to follow-up with for
additional discussion and to perhaps explore the situation with other towing
services that Chopak did not contact. It was noted that there was no update on
this request at the August, September, or now October meetings. c) Verizon upgrade proposal: At the August meeting, the board
expressed its interest in the proposal, pending resolution of a signing bonus,
confirmation that Verizon would guarantee continuing full operation of the
entrance system, and review by the building’s attorney Michael Swaaley.
There was no update at this meeting. d) Election of board Treasurer: Held off until next meeting. e) Insurance and liability of individual unit owners: Miriam Biren
raised the question of whether unit owners could be required by the board to
carry insurance that would cover the type of water damage she has suffered in
recent years. The board will investigate whether a building rule could address
this liability. 6) Building Maintenance & Repairs: a) Elevator mechanical systems: i) Concerning the elevator evaluation performed by Vertical Systems
Analysis (VSA) on May 2, 2006, McGlynn Hayes has not corrected all
twenty-seven deficiencies covered under their maintenance contract but they
are making progress. ii) The board requested an update from Chopak on the similar list of
deficiencies identified in VSA’s May report that were not covered by any
maintenance contract. The board had requested estimates on these repairs at
the May meeting. Chopak indicated that there had been to effort made to
address these concerns, but he would take action immediately. b) Ceiling leaks: There was no update on the ceiling leaks reported
by owners (3-B, 3-F, and 5-J) originally discussed at the May board meeting. c) Window leaks: Becht Engineering has completed site inspection.
Final report anticipated shortly. d) Driveway entrance sign: Bellini has the catalogue for replacement
of the driveway "entrance" sign. Selection process continues. He
will make a recommendation shortly. e) Smoke detector battery replacement: The building super started
this fall’s semi-annual replacements of smoke detector and CO2 detector
batteries for all unit owners. No update by Chopak at this meeting. f) Garage exhaust timer repair: As first discussed at the June board
meeting, the garage exhaust timer is still not operating. August 9, 2006
invoice indicates that a new timer was ordered on that date. Chopak reported
at the September meeting that the fan would be repaired the week following the
board meeting. At this meeting, Chopak reported that the fan will be repaired
in the next couple weeks. It was again noted that this is a code violation
which should have been immediately corrected and that two lobby-level unit
owners had complained that their CO2 detectors had been set off by engine
fumes in the garage. g) Façade restoration: Per September board meeting and negotiation
by board president, Remco bid was approved by the board. Following the approval, further discussion concerning warranty has led Rich
Re to suggest board change their votes to Altus. Boynton asked questions about
painting process, type of primer and paint, and requested 24 hour delay in the
vote in order to get answers to the technical questions from Altus. Board
member’s request was denied. There was a follow-up request that the board
consider delaying the façade restoration until spring. Request denied on
account of the current appearance and condition of the façade (worn off and
peeling paint, detached panels, and holes) and the need to have awning removed
while façade is restored. Board approved Altus bid for primer, two coats of
paint, plus removal and replacement of caulking. Rich Re will confirm details
with Altus. Dissenting vote by Lamoglia noted. h) Entrance awning: The board approved Sign Art bid on awning and
frame replacement. Funding for this job is provided by the insurance
settlement from Access-a-Ride who damaged the awning frame last year. Work to
being once façade is refinished. i) Maintenance Liaison: Victor Bellini reported as "Maintenance
Liaison. He has been working with Joel to develop a comprehensive list of
building needs. j) Garage security: At the September board meeting, Chopak was asked
to get estimates from the building’s current provider in addition to the
upgrade estimate he provided from a Brooklyn vendor. No estimate was available
at this meeting. Chopak indicated that he has not contacted them. k) Lobby refurbishment: On account of the lobby-level hallways’
current condition, the board decided to form a committee to determine various
restoration options for the board to consider. There was no update from the
committee as the committee thought they had been told to hold-off on their
investigations. This was clarified and the committee will move ahead and
continue exploring options. l) Exterminator: There was discussion of rat holes near the garbage
cage and roaches in the compactor and recycling area. Chopak recommended
changing exterminators and proposed 1-year contract for board approval. The
board approved the change in exterminators, subject to no contract commitment
by Highview. m) Exterior screens on HVAC units: There was discussion of birds
building nests in the units. A number of units do not have exterior exhaust
grids on account of the fire escape structure. In the past, Highview has had
the super correct these problems by covering the openings with a heavy duty
screening. Irwin will discuss with the building super and report back at next
meeting. n) Landscaping and lawn maintenance: There was a discussion of Gary’s
Landscaping concerning the quality of work and timely billing. Additional
discussion of owners planting bushes, etc. without board approval. The meeting was adjourned at approximately 10:00 p.m. Robert Boynton, Secretary
Board of Directors - Meeting Minutes
October 10, 2006, 7:30 p.m.