Highview Condominium II
Board of Directors - Meeting Minutes
October 22, 2013  7:30 p.m.

 

The fourth regular meeting of the 2013-2014 Highview Condominium II, Inc. Board of Directors was called to order at approximately 7:30 p.m.  

Board members in attendance: Robert Boynton, Joseph Cann, Marjorie Cannon, Stacey Cohen, Nora Colford, David Cutler, and Joseph Skonieczny.  Michael D'Angelo called-in.  Board member absent: Natalie Hendrix.  Maria Arzano attended from Wentworth Property Management.  

1)   Minutes:  Minutes of the September 24, 2013 meeting were distributed, but deferred for email approval.  

Maintenance update from super:  Chris Brighina reported on building maintenance.  

2)   Building Repair & Maintenance Report:  

a)   Exterior masonry repairs:  Revised contract by KES and approval was scheduled at last meeting to be completed by 10/15/13.  Contract still missing lintel cost/foot.  Email vote currently anticipated by 11/01/13.  

b)   Garage masonry repairs: Masonry repairs by KES to garage access plates and French drain to control water on floor near side entrance approved.  

c)   Entrance area repairs:  Arzano will scan bids and distribute by email.  No estimates yet for refinishing of entrance doors.  Estimates provided for concrete surface and pavers.  Request for stone surface estimate (similar to 830 Howard Ave. entrance) not provided.  

d)   Fall 2013 unit inspections:  Super has started fall unit inspections and battery replacements.  At the same time, will be reviewing units for any evidence of new exterior water infiltration.  

e)   Installation of backflow restrictor and water filtering:  Installation completed.  Waiting for plumber to complete final inspection with City.  

f)    Laundry room contract:  Laundry room contract was approved by email vote.  CoinMach expected to install new machines and renovate room in 90 days.  No update.  

g)   Carpet cleaning:  Carpets scheduled to be cleaned by Stanley Steamer on Monday before Thanksgiving.  

h)   Electrical back-up systems:  Installation of back-up generator and electrical for boiler combustion, boiler pumps, hot water distribution pump and emergency lighting for stairwells estimated to cost approximately $40,000.  Discussion tabled for the evening.  

i)    Wallpaper and carpeting replacement:  Bids submitted.  Still need to determine materials.  

3)   Financial Report  

a)   Unit arrears:  Board reviewed unit arrears with managing agent.  

b)   Special Assessment:  Noted that after allowing 25% for Operating Reserve, Capital Reserve balance is approximately $162,000; $90,000 short of the $250,000 balance mandated by General Membership resolution.  Action required to promptly restore Reserve balance.  Also noted that building will be initiating additional exterior repairs in the next few weeks and any special assessment should attempt to incorporate whatever additional expenses are anticipated beyond regular Operating Budget.  

4)   Legal Report:  

a)   Local Law 11 facade inspection (cycle 6) and Local Law 11 facade inspection (cycle 7):  No update.  

b)   Violations on websites:  Open DOB and ECB building code violations reviewed.  Arzano investigating to gain closure on each.  Two DOB and five ECB.  Management believes that building is in compliance, but each violation requires an inspector to re-inspect and some of the violations relating to Local Law 11 inspection go back years.  

c)   Lease compliance:  No update at this meeting.  

d)   Insurance compliance:  No update at this meeting.  

e)   Building damage from traffic accident:  Insurance claim in process.  Estimate for repairs received; including masonry work to corner of building, lawn sprinkler system repairs, lawn repairs, electrical repairs, and replacement of bollard lighting.  

5)   Annual Holiday Party set for December 16, 2013 at 7:00 p.m.  Marjorie Cannon will coordinate.  Budget of $350 approved.  

The meeting was adjourned at approximately 9:00 p.m  

- Minutes submitted by Robert Boynton, Secretary.