Highview Condominium II
Board of Directors - Meeting Minutes
October 27, 2015 7:30 p.m.
The third regular meeting of the
2015-2016 Highview Condominium II Board of Directors was called to order at
approximately 7:30 p.m. by Robert Boynton, Secretary.
Board members in attendance:
Robert Boynton, Joseph Cann, Marjorie Cannon, Joan Desantis, and Madalina
Rauscher. Joining the meeting later:
Sindhu Mathew and Natalie Hendrix Lombardo.
Board members absent: Michael
D'Angelo and Rosanna Fernandez.
Siobhan Hickey and Marissa Zinnanti attended from Carriage House Property
Management.
1)
Approval of 09/28/15 Minutes:
Minutes were approved by email.
2)
Building Repair & Maintenance:
a) Fire escape
- welding and painting bids: Bid
by Maximum Welding for both repairs and painting was approved by email on
10/06/15. Contractor has started
work and anticipates three weeks to complete.
b) Foundation crack
repairs: Repairs completed by
Tan Interiors. Engineering
inspection by Salamon Engineering completed.
c) Parking lot
resurfacing: Bid tentatively
approved at August meeting while questions remain concerning milling process.
Seeking feedback from Salamon Engineering as four contractor bids not
necessarily identical. No update.
d) Front entrance
area sidewalk renovation and pillar crack repair:
Bid by Milano approved.
e) Front
entrance refinish of doors/windows bids:
Bid received for refinishing doors to original condition.
Boynton requested discussion with contractor concerning explanation of
process.
f) Wallpaper
and carpet replacement: Although
contract signed for work, project on hold pending completion of building loan.
Anticipate January start date.
g) Compactor room -
toilet installation: Awaiting
completion of design work by Salamon Engineering.
h) Electrical back-up
- generator system: Awaiting
completion of design work by Salamon Engineering.
i) North-end
sidewalk &stairwell repairs:
Management continues to receive contractor bids.
j) Garage -
French drain at garage stairwell doorway:
Awaiting bids.
k) Garage floor -
concrete failure near entrance:
Awaiting bids.
l) Water
infiltration reports: Fall 2015
unit inspections began at end of September and approximately 50% of units still
to be inspected. Once complete,
exterior masonry repairs can be bid.
m) Security
upgrades/repairs: Portions of
the project scheduled for November completion.
n) Television antenna
servicing: Building's antenna
scheduled for repair service by Quality Antenna week of 11/23/15.
o) Maintenance
Committee: Committee indicated
that they have not been making weekly inspections.
Members did not have the inspection report form.
Copy will be distributed tomorrow to Sindhu.
p) Boiler servicing
and repairs: Plumbing repairs by
PAC to be completed this Friday, 10/30/15.
Per Joe Cann's recommendation, Starr Boiler will continue to service
burner /combustion issues. Salamon
Engineering's report indicated circulation water system could possibly use
flushing. No update on flushing.
q) Landscaping
Committee: Discussed fall flower
bulb planting, entrance area bench, exterior lighting, condition of sidewalks,
and other exterior landscaping issues.
Cannon chair. Members include
Cannon, Mathew, Boynton, Desantis, and Fernandez.
r) Office
computer: Madalina Rauscher will
be picking up computer cable for the Time Clock connection to computer.
s) Elevator
breakdown and emergency response by Slade:
Noted that Alarmingly Affordable offers emergency telephone support.
Boynton will speak with them tomorrow for details.
4)
Financial Report:
a)
Unit arrears: Board
reviewed unit arrears with managing agent.
b)
Building Loan:
Comprehensive listing of repair and replacement estimates continue to be
gathered. Board Treasurer
maintaining a current list. Loan
discussions with banks continuing.
c)
Audit for FY2015:
FY20015 audit contract to be signed with Wilken & Guttenplan in
October/November.
d)
Monthly financial reporting:
Board has requested monthly financial report to reflect budgeted versus
actual by cost center as well as YTD figures.
Should indicate budget remaining in various cost centers.
5)
Legal Report:
a)
Unit liens: Management
will discuss status of units with building's attorney.
b)
Local Law 11 facade inspection (cycle 7):
Working with Salamon Engineering on fire escape repairs and follow up to
01/2015.
c)
NYC code violations:
One DOB building violation indicated by City on their website as remaining
open/active. Management indicates
violation is from 2012 and will require an engineering report.
At 09/2015 meeting, Board approved Salamon Engineering to conduct the
2012 report required by NYC. No
update.
d)
Lease compliance: Presently one
unit in violation and receiving $500/mo. fine.
e)
Insurance compliance (owner coverage):
Reviewed.
f)
Insurance compliance (leased units/tenant coverage):
Reviewed.
g)
Insurance claim: Possible claim
against the building discussed. Not
certain whether claim is against 830 Howard Ave. or 850 Howard Ave.
No update.
h)
Contact information for unit 3-D and 4-G:
Discussed status of unit and legal contact information.
6)
Summary review of meeting's action items:
Not reviewed.
The meeting was adjourned at
approximately 9:20 p.m
-
Minutes submitted by Robert
Boynton, Secretary.