The fifth meeting of the 2013-2014 Highview Condominium II, Inc. Board of Directors was called to order at approximately 7:30 p.m.  

Board members in attendance: Robert Boynton, Joseph Cann, Marjorie Cannon, Stacey Cohen, Nora Colford, David Cutler, and Joseph Skonieczny.  Michael D'Angelo called-in.  Board member absent: Natalie Hendrix.  Maria Arzano attended from Wentworth Property Management.  

1)   Minutes:  Minutes of the October 22, 2013 meeting were distributed, but deferred for email approval.  

Maintenance update from super:  Chris Brighina reported on building maintenance.  

2)   Building Repair & Maintenance Report:  

a)   Exterior masonry repairs:  Completed.  

b)   Garage masonry repairs: Masonry repairs by KES to garage access plates and French drain to control water on floor near side entrance approved at 10/22/13 meeting.  Not completed.  

c)   Entrance area repairs:  No estimates yet for refinishing of entrance doors.  Response to previous request for stone surface estimate (similar to 830 Howard Ave. entrance) not provided.  No update since 11/27/12 meeting.  

d)   Fall 2013 unit inspections:  Fall unit inspections and battery replacements in progress.  At the same time, will be reviewing units for any evidence of new exterior water infiltration.  

e)   Installation of backflow restrictor and water filtering:  Installation completed.  Leaking when filtration system is turned on.  Plumber and Cascade blaming each other.  Payments by management to both vendors will be withheld until resolved.  

f)    Laundry room:  CoinMach to install new machines and renovate room in 90 days.  Contract was approved prior to October board meeting.  No update.  

g)   Carpet cleaning:  Carpets were cleaned by Stanley Steamer on Monday before Thanksgiving.  

h)   Wallpaper and carpeting replacement:  Bids submitted.  Still need to determine materials.  No update.  

3)   Financial Report  

a)   Unit arrears:  Board reviewed unit arrears with managing agent.  

b)   FY2014 budget:  Management will distribute for board approval prior to December 31st.  

4)   Legal Report:  

a)   Local Law 11 facade inspection (cycle 6) and Local Law 11 facade inspection (cycle 7):  No update since 06/26/12.  

b)   Violations listed on NYC websites:  Open DOB and ECB building code violations reviewed.  Arzano investigating to gain closure on each violation listed on website.  Two DOB and five ECB.  Management believes that building is in compliance, but each violation requires an inspector to re-inspect and some of the violations relating to Local Law 11 inspection go back years.  No update since 09/24/13 meeting.  

c)   Noise violations:  Units 3-A, 4-A, and 5-A subject to noise violations and carpeting inspections from several incidents beginning on weekend of November 1st.  Board reviewed that carpeting and padding covering 80% of unit’s square footage as listed in Prospectus is required.  When requested to perform inspection, building super is only to inventory and measure dimensions of carpeting.  Managing agent is to calculate square footage based on super’s inventory and compare to prospectus for unit’s requirement.  

d)   Lease compliance:  No update at this meeting.  

e)   Insurance compliance:  No update at this meeting.  

f)    Building damage from traffic accident:  Insurance claim in process.  No update at this meeting.  

The meeting was adjourned at approximately 9:00 p.m  